Works from CSV or workbook exports produced from SAP, IBM Maximo, Oracle ERP, Hexagon EAM, Infor, and other ERP, EAM, or CMMS systems. No direct integration or write-back is required — Review data requirements →
Industrial IQ documentation

Reliability Readiness Score

Reliability Readiness Score documentation for AI2COE Industrial IQ buyers, operators, data owners, executives, and governance teams.

8Engines
18Industry guides
0ERP write-back
AI adoption maturity roadmap showing discovery, diagnostics, governance, pilot prioritization, and enterprise scaling stages.
Documentation explains how exported data becomes evidence, reports, actions, and recurring score history.
Task overview

Reliability Readiness Score

Measures spare availability, work-order priority, false stockout risk, planned shutdown readiness, and repeat demand evidence.

This guide explains the operating task, source data needed, validation steps, output interpretation, trust boundary, and where to go next.

UploadCSV export or sample dataset
Source FitRequired fields and data quality
AI MatchColumn aliases and confidence
NormalizeCanonical field preparation
DiagnoseEngine logic and evidence
ReportScore, actions, assumptions
RepeatScore history and renewal value
Required data by engine

Use this table before upload.

EngineRequired Data FileRequired FieldsOptional FieldsOutput GeneratedMinimum Viable UploadEngine-Specific Context
InventoryMind AI Inventory balance CSV Material Id, Quantity Description, Unit Cost, Stock Value, Last Movement Date, Movement Qty, Demand, Criticality, Min Stock Inventory health score, evidence, report, actions, score history Material Id, Quantity Description, Unit Cost, Stock Value, Last Movement Date, Movement Qty, Demand, Criticality, Min Stock
Accepted CSV format

Prepare clean exports before upload.

Use UTF-8 CSV with one header row, one operational record per row, stable identifiers, ISO-style dates where available, numeric values without currency symbols, and separate columns for site, supplier, asset, quantity, value, and owner context.

Common errors: merged header rows, hidden subtotal rows, mixed currencies in one value column, duplicate column names, free-text dates, missing material or asset identifiers, and supplier names embedded inside descriptions.

If fields are missing: Industrial IQ still profiles source fit, but unmapped required fields reduce the AI Match Score, Mapping Readiness Score, diagnostic confidence, and report completeness until the user normalizes the data.

Sample row examples

Minimum viable row patterns.

  • Catalog Intelligence: Description: 6205-2RS bearing sealed SKF
  • Inventory Risk Intelligence: Material Id: MAT-100245 | Quantity: 42
  • Procurement Leakage Intelligence: Po Number: PO_NUMBER | Description: 6205-2RS bearing sealed SKF
  • Working Capital Intelligence: Material Id: MAT-100245 | Stock Value: 1850.00
Related engines

Which diagnostic should the buyer run next?

Related engine

InventoryMind AI

Dead stock, slow-moving stock, excess, stockout risk, and duplicated stock exposure.

Open documentation
Report anatomy

What the buyer can share internally.

Industrial IQ reports include scope, source-fit score, AI match score, mapping readiness, diagnostic confidence, score components, evidence records, assumptions, limitations, review requirements, action items, and recurring score history.

Reliability Readiness ScoreValue lever
Uploaded dataCustomer-specific diagnostic required
InventoryMind AIRelated diagnostic engine
EstimateAssumption-labeled until reviewed
Benchmark assumptionUploaded evidenceConfidence tierHuman reviewReportable value
Documentation context

Use the docs to move from source export to reviewed diagnostic evidence.

Each guide keeps Industrial IQ documentation tied to source preparation, validation, evidence review, and Trust controls.

Docs home
AI2COE Copilot